|
KITS |
| |
 |
| |
|
CEDAR STRIP CONSTRUCTION
Kits come with ready bead and cove cedarstrip, hardwood trim, fibreglass
cloth and all fastenings. Construction should take three to four
weeks depending on the design. No previous woodworking experience
is necessary, just a few simple tools (jigsaw, drill and hand tools)
and enthusiasm. Kits include detailed building instructions and,
should it be required, we can give advice by phone/e-mail/post. |
| |
|
Cut the moulds out of plywood
by jigsaw using the full size paper templates provided. Mount on
a jig (may simply be two planks screwed together) together with
transom/hog/stem as required.
 |
|
Plank the hull using the 'bead
& cove' cedarstrip. The strips are stapled to the hull and glued
edge to edge using the specially formulated wood glue supplied.
 |
|
Remove the staples and sand the exterior of
the hull. Sheath in fibreglass cloth and epoxy.

|
|
Remove from the moulds, turn over, sand and
glass sheath the interior. |
|
Fit gunwales.

|
|
On dinghies fit keel, bilge stringers and
stem as required.

|
|
Fit seats and rest of the trim. Assemble sailing
rig and boards as required from the materials provided.

|
|
Finish in paint or varnish as required.
|